Oil & Gas Control and Safety Systems
TDL delivers control system upgrades, integrated control and safety systems (ICSS) and hazardous-area control panels for oil and gas facilities. Project references cover a gas processing plant, a gas distribution station, a refinery, offshore platforms and an LNG export terminal.
What TDL delivers
Integrated Control & Safety Systems (ICSS)
ICSS for onshore and offshore oil & gas facilities and petrochemical plants. Process control on redundant ControlLogix with 1715 redundant I/O, PlantPAx and AVEVA. Safety instrumented systems for SIL 2 and SIL 3 functions on AADvance and Trusted, including ESD and Fire & Gas; safety PLC applications on GuardLogix. Cause & effect implementation and witnessed testing.
PLC & Control System Migration
Allen-Bradley
PLC-5 , SLC 500 and MicroLogix, GE Fanuc, Siemens S5 and HIMA systems upgraded to ControlLogix and CompactLogix; ControlNet and DeviceNet to EtherNet/IP; older HMI/SCADA (RSView32, Citect, PanelView) to FactoryTalk View and PanelView Plus 7. Drive upgrades: DC drives to PowerFlex DC, legacy servo drives to Kinetix. Site survey, code conversion, FAT/SAT and planned cut-over, onshore and on offshore platforms.Industrial Networks & OT Security
EtherNet/IP networks on Stratix managed switches, with redundancy by DLR rings, PRP and HSR. VLAN segmentation, firewalls and secure remote access following IEC 62443 zone and conduit principles. Interfaces to third-party systems over Modbus and OPC UA.
Control Panel Engineering
Control and marshalling panels: design, schematics, fabrication, wiring and factory acceptance testing before shipment. Ex-rated enclosures for hazardous areas.
Project references
- 2025–2026 – JVPC Rang Dong Field – RO Water Maker PLC Upgrade, SLC 500 to CompactLogix 5380SLC 500 → CompactLogix 5380 · RO water maker · offshore installation
- 2025 – Golden Pass LNG – Auxiliary Boiler Control System CommissioningRedundant ControlLogix · 1715 redundant I/O · PRP · on-site commissioning in Texas
- 2024 – BSR – Steam Turbine Generator (STG) Network & HMI UpgradeControlNet → EtherNet/IP · RSView32 → FactoryTalk View SE
- 2023–2024 – PVEP DMDP-A Platform – Offshore Compressor Control System UpgradesOffshore platform · ControlNet → EtherNet/IP · PanelView Plus 6 → 7 · FAT · offshore commissioning
- 2023 – PV GAS Vung Tau Terminal (Thi Vai) – Loading Arm System HMI ReplacementRSView32 → FactoryTalk View SE · DH+ to EtherNet/IP · existing
PLC-5 kept - 2023 – FSO Rang Dong MV17 – Hi-Foam Control System Functional TestHi-Foam fire-fighting control · Omron CJ1M · functional test on board
- 2022 – JVPC N1 Wellhead Platform – Process Control System UpgradeOffshore wellhead platform ·
PLC-5 → ControlLogix · central SCADA integration - 2021 – Phu My Gas Distribution Station – Heater
E-401B Controller UpgradeMicroLogix 1100 · water bath heater burner control · flameproof and dust-protected panel · Zone 1/2 and Zone 21/22 - 2021 – PV GAS Vung Tau Terminal (Thi Vai) – SC300E Shutdown System Firmware UpgradeSC300E shutdown system firmware upgrade · site tests with the system vendor
- 2021 – Phu My Gas Distribution Station – Inlet Shut-off Valve SystemInlet shut-off valves · AADvance and ControlLogix programming · FactoryTalk View SE
- 2020 – Vietsovpetro Central Compressor Platform – EDG and Switchgear Control System UpgradeSLC 500 → CompactLogix · FactoryTalk View SE · Modbus TCP to ICSS ·
8-day shutdown - 2020 – Ba Ria GDS and LBV Stations – Redundant Closing Signals
HS-804 ,HS-805 ,HS-807 Redundant closing signals · 1715 redundant I/O · ControlLogix and FactoryTalk View SE - 2019 – Phu My Gas Distribution Station –
PLC-5 / HIMA to ICSS UpgradePLC-5 / HIMA → ICSS on ControlLogix and AADvance - 2019 – Dinh Co GPP – CC01 Turbo Expander Control System UpgradeSLC 500 → redundant ControlLogix · Zone 2 Ex panels
- 2019 – Vietsovpetro
BK-20 &BK-21 Wellhead Platforms – ICSSICSS materials · ControlLogix · AADvance · FactoryTalk View · engineering support - 2019 – PVEP Thang Long – Dong Do Platform – ICSS Maintenance and RepairICSS maintenance · program backup · new workstations · offshore commissioning
- 2018 – Vietsovpetro LP Compressor – Siemens S5 and Bently Nevada 3300 UpgradeSiemens S5 and Bently Nevada 3300 → ControlLogix and Rockwell Automation vibration monitoring · Bureau Veritas witness
- 2017 – Vietsovpetro Riserblock Platform – Sieger Fire & Gas System UpgradeSieger F&G → AADvance · fault-tolerant I/O · fire and gas detectors
- 2017 – Dinh Co GPP – Governor Air/Fuel Control System Replacement for Gas CompressorsGovernor air/fuel control replacement · integrated into ControlLogix
- 2016 – Vietsovpetro Central Compressor Platform – SIL 3 Fire & Gas SystemFire & Gas system · AADvance · gas and fire detectors · engineering support
- 2016 – Dinh Co GPP – Gas Compressors
K-01 ,K-02 ,K-03 Control System ReplacementSLC 500 → redundant ControlLogix · PanelView · field instruments - 2015 – Dinh Co GPP – Vibration Monitoring for Gas Compressors
K-1011A /B/C/DAllen-Bradley XM modules · vibration sensors · Emonitor · gas compressors - 2014 – Ba Ria Gas Distribution Station – Piping Monitoring Control System Upgrade
PLC-5 / RSView32 → redundant ControlLogix / FactoryTalk View SE - 2013 – Vietsovpetro Central Compressor Platform – CO2 Control System UpgradeFully redundant ControlLogix · PanelView · offshore installation
Technical articles
- What Is an ICSS? Integrated Control and Safety Systems in Oil and Gas: PCS, SIS/ESD, F&G on Rockwell
- Control and safety systems at an LNG terminal: DCS, SIS/ESD, fire and gas, and package control systems
- What is SIL: the safety integrity level of a safety function (SIF), SIL 1 to SIL 4, PFD and proof testing
- AADvance vs Trusted: safety controller architectures, processor and I/O modules, and the SIL Rockwell states
- What is a DCS? PLC-based system vs DCS, Rockwell PlantPAx and where the SIS fits in an ICSS
- Vibration monitoring and predictive maintenance for compressors and turbines: sensors, API 670, retrofit
- What to check on a ControlLogix redundancy system before FAT: a checklist for 5580 and 5570
PLC-5 to ControlLogix Migration: Converting the Program, Keeping or Replacing 1771 I/O, and What the Tool Won't Do
Planning a control system upgrade or ICSS for an oil & gas facility?
Speak directly with our engineers. Send your RFQ, scope of work or drawings: the engineers who program and commission the systems read them and reply, from the first review of the existing system to the proposed solution.
Email sales@tdl-ia.com.vn Request a site survey Hotline · Urgent breakdown support