How a Control System Project Runs at TDL

These are the steps of a TDL control system project, from the first site survey to support after hand-over. Each step links to projects where it was part of TDL's scope; which steps a project needs depends on that scope.

Step by step

Related services

Frequently Asked Questions

Is the program tested before the plant stops?

Yes, where the project allows it. At Crown Da Nang the body maker program was tested before the shutdown, and the system was installed and started up during the line 1 shutdown.

Does the client take part in the FAT?

In the project references the FAT is done with the client before shipment, for example for the hazardous-area heater panel at Phu My Gas Distribution Station.

What is handed over at the end?

The hand-over documents: the FDS, I/O list, cause and effect matrix where there is a safety system, FAT and SAT procedures and reports, as-built drawings, PLC, HMI and SCADA program backups and O&M documents, with operator training where it is in scope and technical support after hand-over.

Starting a control system project?

Speak directly with our engineers. Send your RFQ, scope of work or drawings: the engineers who program and commission the systems read them and reply, from the first review of the existing system to the proposed solution.

Email sales@tdl-ia.com.vn Request a site survey Hotline · Urgent breakdown support