Golden Pass LNG – Auxiliary Boiler Control System Commissioning 2025
A single TDL engineer commissioned the auxiliary boiler control system on site at the Golden Pass LNG export terminal in Sabine Pass, Texas, working for the boiler package vendor.
Key Facts
| End user | Golden Pass LNG Terminal |
|---|---|
| Contracted by | Boiler package vendor |
| Location | Sabine Pass, Texas, USA |
| Industry | Oil & Gas – LNG |
| Year | 2025 |
| Control system | Redundant ControlLogix with 1715 redundant I/O |
| Network | Parallel Redundancy Protocol (PRP) |
| Integration | Terminal DCS (DeltaV) |
| Safety | BMS/SIS validation (SIL 2) |
| TDL role | On-site commissioning, integration and start-up support |
Scope of Supply
- Control system: High-availability boiler control on redundant ControlLogix controllers with 1715 redundant I/O.
- Network: Parallel Redundancy Protocol (PRP) network architecture.
- Integration: Integration with the terminal's DeltaV distributed control system.
- Commissioning: BMS/SIS validation for SIL 2 safety functions, HMI deployment and full start-up support through to hand-over, on site in Texas.


More Projects
- 2025 – P&G Cabuyao (Philippines) 2-Lane Servo Capper Automation
- 2024 – BSR Steam Turbine Generator Network & HMI Upgrade
- 2023–2024 – PVEP DMDP‑A Platform, Offshore Compressor Control Upgrades
- 2022 – Vinh Hoan FeedOne Aquafeed Factory, Process Control & SCADA
- 2021 – Phu My Gas Distribution Station – Heater E-401B Controller Upgrade
- 2020 – Pha Lai II Thermal Power Plant Subsidiary Systems
- 2019 – Dinh Co GPP CC01 Turbo Expander
- 2019 – Phu My Gas Distribution Station ICSS