Golden Pass LNG – Auxiliary Boiler Control System Commissioning 2025
A single TDL engineer commissioned the auxiliary boiler control system on site at the Golden Pass LNG export terminal in Sabine Pass, Texas, working for the boiler package vendor.
Key Facts
| End user | Golden Pass LNG Terminal |
|---|---|
| Contracted by | Boiler package vendor |
| Location | Sabine Pass, Texas, USA |
| Industry | Oil & Gas – LNG |
| Year | 2025 |
| Control system | Redundant ControlLogix with 1715 redundant I/O |
| Network | Parallel Redundancy Protocol (PRP) |
| Integration | Terminal DCS (DeltaV) |
| Safety | BMS/SIS functional testing (SIL 2) |
| TDL role | On-site commissioning, integration and start-up support |
Scope of Supply
- Control system: High-availability boiler control on redundant ControlLogix controllers with 1715 redundant I/O.
- Network: Parallel Redundancy Protocol (PRP) network architecture.
- Integration: Integration with the terminal's DeltaV distributed control system.
- Commissioning: Functional testing of the BMS/SIS for SIL 2 safety functions, HMI deployment and full start-up support through to hand-over, on site in Texas.


Related Oil & gasICSS & safety systemsIndustrial networks & OT securityMachine builders & package vendorsRockwell Automation (Allen-Bradley)How a TDL project runs
More Projects
- 2025–2026JVPC Rang Dong Field – RO Water Maker PLC Upgrade, SLC 500 to CompactLogix 5380
- 2024BSR – Steam Turbine Generator (STG) Network & HMI Upgrade
- 2023–2024PVEP DMDP-A Platform – Offshore Compressor Control System Upgrades
- 2023PV GAS Vung Tau Terminal (Thi Vai) – Loading Arm System HMI Replacement
- 2023FSO Rang Dong MV17 – Hi-Foam Control System Functional Test
- 2022JVPC N1 Wellhead Platform – Process Control System Upgrade
- 2021Phu My Gas Distribution Station – Heater
E-401B Controller Upgrade - 2021PV GAS Vung Tau Terminal (Thi Vai) – SC300E Shutdown System Firmware Upgrade