Industrial Networks and OT Security
TDL designs and builds EtherNet/IP networks on Stratix managed switches, with redundancy by DLR rings, PRP and HSR, migrates ControlNet and DeviceNet to EtherNet/IP, and applies VLAN segmentation, firewalls and secure remote access following IEC 62443 zone and conduit principles.
What TDL delivers
Industrial Networks & OT Security
EtherNet/IP networks on Stratix managed switches, with redundancy by DLR rings, PRP and HSR. VLAN segmentation, firewalls and secure remote access following IEC 62443 zone and conduit principles. Interfaces to third-party systems over Modbus and OPC UA.
PLC & Control System Migration
Allen-Bradley
PLC-5 , SLC 500 and MicroLogix, GE Fanuc, Siemens S5 and HIMA systems upgraded to ControlLogix and CompactLogix; ControlNet and DeviceNet to EtherNet/IP; older HMI/SCADA (RSView32, Citect, PanelView) to FactoryTalk View and PanelView Plus 7. Drive upgrades: DC drives to PowerFlex DC, legacy servo drives to Kinetix. Site survey, code conversion, FAT/SAT and planned cut-over, onshore and on offshore platforms.
Project references
- 2024–2026 – P&G Vietnam Dong An – Packing Line Control System ModernizationUltra3000, Kinetix 300/350 → Kinetix 5300 · CompactLogix 5380 · EtherNet/IP · PanelView Plus 7
- 2025 – Golden Pass LNG – Auxiliary Boiler Control System CommissioningRedundant ControlLogix · 1715 redundant I/O · PRP · on-site commissioning in Texas
- 2025–ongoing – SEHC – FMCS and PMS Maintenance and IntegrationYearly maintenance · ControlLogix firmware and redundancy · AVEVA System Platform · 37 PLCs
- 2024 – BSR – Steam Turbine Generator (STG) Network & HMI UpgradeControlNet → EtherNet/IP · RSView32 → FactoryTalk View SE
- 2023–2024 – PVEP DMDP-A Platform – Offshore Compressor Control System UpgradesOffshore platform · ControlNet → EtherNet/IP · PanelView Plus 6 → 7 · FAT · offshore commissioning
- 2024–ongoing – P&G Vietnam Dong An – Network Discovery and Control System ModernizationNetwork audit and redesign · VLAN segmentation · PLC, HMI and drive migration · packing lines
- 2020 – Vietsovpetro Central Compressor Platform – EDG and Switchgear Control System UpgradeSLC 500 → CompactLogix · FactoryTalk View SE · Modbus TCP to ICSS ·
8-day shutdown
Service packages
- Replace ordinary switches with managed Stratix and segment the control network with VLANs
- Secure remote access setup for technical support
Technical articles
- Firewalls for FactoryTalk and Logix systems: open the right ports, not "any"
- AVEVA System Platform security: System Management Server, certificates, encrypted SuiteLink and Galaxy roles
- Stratix 5200 (
1783-CMS ) switch setup: Express Setup, IP, VLANs, DLR, PRP, backup and replacing a Stratix 5700 - CIP Security on ControlLogix 5580, CompactLogix 5380: FactoryTalk Policy Manager, zones, conduits, Trusted IP
- Ignition Gateway security: HTTPS, identity providers, security levels and zones, Gateway Network, audit logs
- Rockwell Allen-Bradley PLC security: off the internet, RUN keyswitch, port 44818 blocked, firmware, backups
- IEC 62443 explained: zones, conduits, security levels and the Purdue model
- DLR or PRP: Choosing Redundancy for an EtherNet/IP Network
Planning a network upgrade or an OT security review?
Speak directly with our engineers. Send your RFQ, scope of work or drawings: the engineers who program and commission the systems read them and reply, from the first review of the existing system to the proposed solution.
Email sales@tdl-ia.com.vn Request a site survey Hotline · Urgent breakdown support