Automation for Beverage Can Plants
TDL has worked on the control systems of beverage can lines at Crown's Dong Nai and Da Nang plants since 2017: the cupper and body makers at the front end, the conveyors and line control between them, end-of-line packaging and the compressed air supply. The projects below are grouped by line stage.
By line stage
Cupper
The cupper on can line 1 at Dong Nai upgraded from
PLC-5 to ControlLogix 5570 with a PanelView Plus 7 HMI, PowerFlex 755 and PowerFlex 525 drives, a resolver-based cam module and a Guardmaster safety relay.Project references
Body makers
Body maker control moved from
PLC-5 to CompactLogix at Dong Nai, and from DeviceNet to ControlLogix 5580 on EtherNet/IP at Da Nang, installed and started up inside the line 1 shutdown.Front end conveyors and line control
Front end swap of Can Line 3 and Can Line 4: motor power and sensor wiring moved between the two line control systems, a panel extension, PowerFlex 525 drives for the cup conveyors and Ethernet links from six body makers, with the PLC programs of both lines changed and tested.
Project references
End of line
A new strapper integrated with the existing packaging conveyor: I/O configuration, integration programming, commissioning and operator training.
Project references
Compressed air
A control cabinet with two 90 kW variable-frequency drives for two air compressor motors at Da Nang, with PLC and HMI monitoring in the plant control system.
Project references
Related services
PLC & Control System Migration
Allen-Bradley
PLC-5 , SLC 500 and MicroLogix, GE Fanuc, Siemens S5 and HIMA systems upgraded to ControlLogix and CompactLogix; ControlNet and DeviceNet to EtherNet/IP; older HMI/SCADA (RSView32, Citect, PanelView) to FactoryTalk View and PanelView Plus 7. Drive upgrades: DC drives to PowerFlex DC, legacy servo drives to Kinetix. Site survey, code conversion, FAT/SAT and planned cut-over, onshore and on offshore platforms.Control Panel Engineering
Control and marshalling panels: design, schematics, fabrication, wiring and factory acceptance testing before shipment. Ex-rated enclosures for hazardous areas.
Breakdown Support & Lifecycle Services
Line down? TDL troubleshoots on site or remotely, fixes programs and supplies replacement Allen-Bradley parts to get production running again. Also commissioning, preventive maintenance, PLC backup and version control (FactoryTalk AssetCentre), vibration monitoring and training on Rockwell Automation and AVEVA software.
Project references
- 2026 – Crown Da Nang – Body Maker Control Upgrade to ControlLogix 5580ControlLogix 5580 · DeviceNet to EtherNet/IP · PowerFlex 755 / 525 · PanelView Plus 7
- 2026 – Crown Dong Nai – Can Line 3 and Can Line 4 Front End SwapCan Line 3 ↔ Can Line 4 front end swap · motors and sensors re-routed · PowerFlex 525 · PLC changes on both lines
- 2025 – Crown Da Nang – VFD Control Cabinet for Two CompressorsTwo 90 kW VFDs · control cabinet design · PLC and HMI · integration with plant control
- 2024 – Crown Dong Nai – New Strapper Machine IntegrationNew strapper integrated with the existing conveyor · commissioning and training
- 2023 – Crown Dong Nai – Cupper Line 1
PLC-5 to ControlLogix UpgradePLC-5 → ControlLogix · PanelView Plus 7 · PowerFlex 755 - 2017 – Crown Dong Nai – Body Maker
PLC-5 to CompactLogix UpgradePLC-5 → CompactLogix · PanelView · AC drives · central SCADA interface
Frequently Asked Questions
Which can line machines has TDL worked on?
At Crown's Dong Nai and Da Nang plants: the cupper and body makers, the front end conveyors of two can lines, a new strapper at the end of line and the drive cabinet for two air compressors.
Can a body maker upgrade be done within a line shutdown?
At Crown Da Nang in 2026 the program was tested before the shutdown, and the ControlLogix 5580 system was installed and started up during the line 1 shutdown.
What happens to old PLC-5 and DeviceNet systems on the line?
On the Dong Nai cupper and body maker,
Planning a cupper, body maker or can line upgrade?
Speak directly with our engineers. Send your RFQ, scope of work or drawings: the engineers who program and commission the systems read them and reply, from the first review of the existing system to the proposed solution.
Email sales@tdl-ia.com.vn Request a site survey Hotline · Urgent breakdown support