Automation for Coal-Fired Power Plants
TDL has worked on the auxiliary systems of two thermal power plants in Vietnam. At Pha Lai II (2020) it migrated the
By plant system
Ash handling, FGD and ESP
At Pha Lai II, the
PLC-5 / Citect controls of the ash handling, flue gas desulphurisation (FGD) and electrostatic precipitator (ESP) systems moved to ControlLogix and FactoryTalk View SE.Project references
Soot blowers
The soot blower control at Pha Lai II, part of the same 2020 migration from
PLC-5 / Citect to ControlLogix and FactoryTalk View SE.Project references
Water and wastewater treatment
The water treatment and wastewater treatment controls at Pha Lai II, migrated in the same project.
Project references
Interfaces to the plant DCS
On the Pha Lai II migration TDL did the PLC and HMI programming, network engineering and the interfacing to the DCS and third-party systems, fabricated and installed the control panels, and carried out start-up, commissioning and hand-over; the main hardware and software were supplied by the EPC contractor.
Project references
Emergency shutdown (ESD)
At Thai Binh 2, technical consultation on the ESD system on Trusted: field operation and testing according to the SAT documents, Trusted hardware and logic consulting, and resolution of ESD problems and errors.
Project references
Related services
PLC & Control System Migration
Allen-Bradley
PLC-5 , SLC 500 and MicroLogix, GE Fanuc, Siemens S5 and HIMA systems upgraded to ControlLogix and CompactLogix; ControlNet and DeviceNet to EtherNet/IP; older HMI/SCADA (RSView32, Citect, PanelView) to FactoryTalk View and PanelView Plus 7. Drive upgrades: DC drives to PowerFlex DC, legacy servo drives to Kinetix. Site survey, code conversion, FAT/SAT and planned cut-over, onshore and on offshore platforms.Integrated Control & Safety Systems (ICSS)
ICSS for onshore and offshore oil & gas facilities and petrochemical plants. Process control on redundant ControlLogix with 1715 redundant I/O, PlantPAx and AVEVA. Safety instrumented systems for SIL 2 and SIL 3 functions on AADvance and Trusted, including ESD and Fire & Gas; safety functions up to SIL 2 / PLd or SIL 3 / PLe on GuardLogix, depending on controller configuration, and Logix SIS on ControlLogix 5590. Cause & effect implementation and witnessed testing.
Control Panel Engineering
Control and marshalling panels: design, schematics, fabrication, wiring and factory acceptance testing before shipment. Ex-rated enclosures for hazardous areas.
Project references
- 2022 – Thai Binh 2 Thermal Power Plant – ESD System Consultation (Trusted)ESD system · Trusted hardware and logic consulting · field testing per SAT documents
- 2020 – Pha Lai II Thermal Power Plant – Subsidiary Systems Migration
PLC-5 / Citect → ControlLogix / FactoryTalk View SE
Frequently Asked Questions
Which power plant systems has TDL worked on?
At Pha Lai II Thermal Power Plant (2020): the ash handling, FGD, ESP, soot blower, water treatment and wastewater treatment systems, migrated from
Does the work cover the interface to the plant DCS?
On the Pha Lai II project the scope included the interfacing to the DCS and third-party systems, together with PLC and HMI programming and network engineering.
What did the ESD consultation at Thai Binh 2 cover?
Field operation and testing according to the system's SAT documents, Trusted hardware and logic consulting, and handling of problems and errors related to the ESD system.
Planning a PLC, HMI or shutdown system upgrade on a power plant's auxiliary systems?
Speak directly with our engineers. Send your RFQ, scope of work or drawings: the engineers who program and commission the systems read them and reply, from the first review of the existing system to the proposed solution.
Email sales@tdl-ia.com.vn Request a site survey Hotline · Urgent breakdown support