Dinh Co GPP – Gas Compressors K-01 , K-02 , K-03 Control System Replacement 2016
TDL replaced the SLC 500 control systems of gas compressors
Key Facts
| End user | PetroVietnam Gas |
|---|---|
| Facility | Dinh Co Gas Processing Plant (GPP), gas compressors |
| Location | Dinh Co, Vietnam |
| Industry | Oil & Gas – gas processing |
| Year | 2016 |
| Original system | Allen-Bradley SLC 500 |
| Upgraded to | Redundant ControlLogix · PanelView HMI |
| TDL role | Supply, field instruments, installation, mechanical modification, PLC and HMI programming, network engineering, commissioning |
Scope of Supply
- Procurement: Redundant ControlLogix system, PanelView HMI, field instruments and accessories.
- Hardware engineering: Installation at site and modification of the existing mechanical system.
- Software engineering: PLC and HMI programming, network engineering and third-party system interfacing.
- On-site services: Start-up, commissioning and hand-over at site.
More Projects
- 2025–2026JVPC – RO Water Maker PLC Upgrade, Rang Dong Field
- 2025Golden Pass LNG (USA) Auxiliary Boiler Control System Commissioning
- 2024BSR Steam Turbine Generator Network & HMI Upgrade
- 2023–2024PVEP DMDP‑A Platform, Offshore Compressor Control Upgrades
- 2023PV GAS Vung Tau Terminal (Thi Vai) – Loading Arm System HMI Replacement
- 2023FSO Rang Dong MV17 – Hi-Foam Control System Functional Test
- 2022JVPC N1 Wellhead Platform – Process Control System Upgrade
- 2021Phu My Gas Distribution Station – Heater
E-401B Controller Upgrade