JVPC N1 Wellhead Platform – Process Control System Upgrade 2022
TDL migrated the legacy PLC-5 controller on JVPC's N1 wellhead platform, offshore Vietnam, to ControlLogix, providing complete automation equipment and software services through to commissioning and handover.
Key Facts
| Client | JVPC (Japan Vietnam Petroleum Company) |
|---|---|
| Facility | N1 wellhead platform, offshore Vietnam |
| Industry | Oil & Gas – offshore production |
| Year | 2022 |
| Original system | Allen-Bradley PLC-5 |
| Upgraded to | ControlLogix, FactoryTalk |
| Integration | Central SCADA communication |
| TDL role | Equipment supply, PLC and HMI programming, control network configuration, installation, commissioning and handover |
Scope of Supply
- Supply: Complete automation equipment and software.
- Software engineering: PLC and HMI programming, control network configuration and central SCADA communication integration.
- On-site services: Work carried out from the FSO: installation, configuration, commissioning and handover.

Related: Oil & gas · PLC-5 & SLC 500 migration · SCADA & historian
More Projects
- 2025 – Golden Pass LNG (USA) Auxiliary Boiler Control System Commissioning
- 2025 – P&G Cabuyao (Philippines) 2-Lane Servo Capper Automation
- 2024 – BSR Steam Turbine Generator Network & HMI Upgrade
- 2023–2024 – PVEP DMDP‑A Platform, Offshore Compressor Control Upgrades
- 2022 – Vinh Hoan FeedOne Aquafeed Factory, Process Control & SCADA
- 2021 – Phu My Gas Distribution Station – Heater E-401B Controller Upgrade
- 2020 – Pha Lai II Thermal Power Plant Subsidiary Systems
- 2019 – Dinh Co GPP CC01 Turbo Expander
- 2019 – Phu My Gas Distribution Station ICSS
- 2019 – Vietsovpetro BK-20 & BK-21 Wellhead Platforms – ICSS
- 2019 – PVEP Thang Long – Dong Do Platform – ICSS Maintenance and Repair
- 2017 – Vietsovpetro Riserblock Platform – Sieger Fire & Gas System Upgrade
- 2016 – Vietsovpetro Central Compressor Platform – SIL 3 Fire & Gas System