Vietsovpetro Central Compressor Platform – SIL 3 Fire & Gas System 2016
For the fire and gas control system on Vietsovpetro's Central Compressor Platform in the Bach Ho field, TDL supplied the main materials and provided engineering consulting to support Vietsovpetro's engineering team.
Key Facts
| Client | Vietsovpetro |
|---|---|
| Facility | Central Compressor Platform, Bach Ho field, offshore Vietnam |
| Industry | Oil & Gas – offshore production |
| Year | 2016 |
| System | AADvance (process safety) · gas and fire detectors · Rittal enclosures |
| Safety | SIL 3 process safety system for the fire and gas functions |
| TDL role | Supply of main materials and engineering consulting |
Scope of Supply
- Supply: AADvance PLC for process safety, Rockwell software, gas and fire detectors, Rittal enclosures, and related industrial PCs, switches and network components.
- Engineering support: Engineering consulting services to support Vietsovpetro's engineering team during project development.

Related: Oil & gas · ICSS & safety systems
More Projects
- 2025 – Golden Pass LNG (USA) Auxiliary Boiler Control System Commissioning
- 2025 – P&G Cabuyao (Philippines) 2-Lane Servo Capper Automation
- 2024 – BSR Steam Turbine Generator Network & HMI Upgrade
- 2023–2024 – PVEP DMDP‑A Platform, Offshore Compressor Control Upgrades
- 2022 – Vinh Hoan FeedOne Aquafeed Factory, Process Control & SCADA
- 2022 – JVPC N1 Wellhead Platform – Process Control System Upgrade
- 2021 – Phu My Gas Distribution Station – Heater E-401B Controller Upgrade
- 2020 – Pha Lai II Thermal Power Plant Subsidiary Systems
- 2019 – Dinh Co GPP CC01 Turbo Expander
- 2019 – Phu My Gas Distribution Station ICSS
- 2019 – Vietsovpetro BK-20 & BK-21 Wellhead Platforms – ICSS
- 2019 – PVEP Thang Long – Dong Do Platform – ICSS Maintenance and Repair
- 2017 – Vietsovpetro Riserblock Platform – Sieger Fire & Gas System Upgrade