JVPC Rang Dong Field – RO Water Maker PLC Upgrade, SLC 500 to CompactLogix 5380 2025–2026
TDL upgraded the SLC 500 control system of the reverse osmosis water maker on a JVPC platform in the Rang Dong field to CompactLogix 5380, keeping the existing panel, field wiring and operator terminal, from site survey and FAT to offshore commissioning.
Key Facts
| End user | JVPC |
|---|---|
| Facility | Reverse osmosis (RO) water maker package, utilities and living quarters platform, Rang Dong field, offshore Vietnam |
| Industry | Oil & Gas – offshore production |
| Year | 2025–2026 |
| Original system | SLC 5/03 (1747-L532E) with 1746 I/O · HMI on DH-485 |
| Upgraded to | CompactLogix 5380 (5069-L320ER) with 5069 I/O · existing PanelView relinked over EtherNet/IP |
| Integration | Existing hardwired interface to the platform DCS kept; Ethernet ports ready for a future network link |
| TDL role | Site survey, migration engineering, logic conversion, drawings and documents, FAT with the client, offshore installation, SAT, commissioning and training |
Scope of Supply
- Engineering: Site survey, upgrade strategy, migration of the SLC 500 logic to CompactLogix and updated wiring diagrams and control narrative.
- Hardware: CompactLogix 5380 controller with 5069 digital and analog I/O and a managed Ethernet switch, installed in the existing panel without changing field wiring.
- HMI: Existing PanelView application relinked from DH-485 to EtherNet/IP.
- Testing: FAT with the client's electrical and instrument team.
- Offshore: Installation, SAT and commissioning on the platform, training and as-built documents.


Related: Oil & gas · PLC-5 & SLC 500 migration
More Projects
- 2025 – Golden Pass LNG (USA) Auxiliary Boiler Control System Commissioning
- 2024 – BSR Steam Turbine Generator Network & HMI Upgrade
- 2023–2024 – PVEP DMDP‑A Platform, Offshore Compressor Control Upgrades
- 2023 – Thi Vai Terminal – Loading Arm System HMI Replacement
- 2023 – FSO Rang Dong MV17 – Hi-Foam Control System Functional Test
- 2022 – JVPC N1 Wellhead Platform – Process Control System Upgrade
- 2021 – Phu My Gas Distribution Station – Heater E-401B Controller Upgrade