Automation for Fertilizer Plants
TDL has upgraded control systems at Phu My Fertilizer Plant (PVFCCo) since 2015, four of the projects for the EPC contractor: the natural gas compressor and the
By plant area
Gas compression
The GE Fanuc PLC and GE SCADA of a motor-driven natural gas compressor migrated to redundant ControlLogix 5580 with 1715 redundant I/O, keeping the Bently Nevada 3500 machinery protection, the anti-surge and performance controllers and the Modbus links to the plant DCS.
Ammonia compressor
The
PLC-5 control system of the40-PK-5001 ammonia compressor replaced with redundant ControlLogix 5580, FLEX 5000 I/O and a PanelView Plus 7 HMI in the retrofitted existing panel, keeping all existing control logic and system interfaces; FAT with I/O, diagnostic and redundant processor tests, then SAT.Demineralized water
The demineralization system control moved to new ControlLogix hardware, with the redundant ControlLogix program migrated and a new FactoryTalk View ME application for the PanelView terminal.
Conveying and packing
The FAM conveyor and Libra packing control system upgraded from ControlLogix 5555 and RSView32 to ControlLogix 5570 and FactoryTalk View, with control panel fabrication, PLC and HMI programming, network engineering and third-party interfacing.
Conveyor tripper car
The SLC 500 control of the belt conveyor tripper car replaced with ControlLogix 5580 XT and Flex XT remote I/O on an EtherNet/IP DLR with a ControlNet fibre link, in a new stainless-steel IP55 panel; position and fault signals go to the plant's FAM system.
Project references
Fuel gas
The SLC 500 fuel gas control system upgraded to redundant ControlLogix with redundant I/O, with control panel fabrication and installation, PLC and HMI programming and commissioning.
Project references
Related services
PLC & Control System Migration
Allen-Bradley
PLC-5 , SLC 500 and MicroLogix, GE Fanuc, Siemens S5 and HIMA systems upgraded to ControlLogix and CompactLogix; ControlNet and DeviceNet to EtherNet/IP; older HMI/SCADA (RSView32, Citect, PanelView) to FactoryTalk View and PanelView Plus 7. Drive upgrades: DC drives to PowerFlex DC, legacy servo drives to Kinetix. Site survey, code conversion, FAT/SAT and planned cut-over, onshore and on offshore platforms.Control Panel Engineering
Control and marshalling panels: design, schematics, fabrication, wiring and factory acceptance testing before shipment. Ex-rated enclosures for hazardous areas.
Industrial Networks & OT Security
EtherNet/IP networks on Stratix managed switches, with redundancy by DLR rings, PRP and HSR. VLAN segmentation, firewalls and secure remote access following IEC 62443 zone and conduit principles. Interfaces to third-party systems over Modbus and OPC UA.
Project references
- 2025 – Phu My Fertilizer Plant –
40-PK-5001 Ammonia Compressor Control ReplacementPLC-5 → redundant ControlLogix 5580 · FLEX 5000 I/O · PanelView Plus 7 - 2023 – Phu My Fertilizer Plant – Natural Gas Compressor Control System MigrationGE Fanuc → redundant ControlLogix 5580 · 1715 redundant I/O · anti-surge integration
- 2023 – Phu My Fertilizer Plant – Tripper Car Control System UpgradeSLC 500 → ControlLogix 5580 XT · Flex XT I/O · stainless-steel panel
- 2021 – Phu My Fertilizer Plant – Demineralization System ControlLogix RelocationRedundant ControlLogix relocation · program migration · PanelView HMI
- 2017 – Phu My Fertilizer Plant – Fuel Gas Control System UpgradeSLC 500 → redundant ControlLogix with redundant I/O
- 2015 – Phu My Fertilizer Plant – FAM Conveyor and Libra Packing Control System UpgradeControlLogix 5555 / RSView32 → ControlLogix 5570 / FactoryTalk View
Frequently Asked Questions
Which systems at Phu My Fertilizer Plant has TDL worked on?
From 2015 to 2025: the natural gas compressor and the
Can a compressor control upgrade keep the existing logic and panel?
On the
Does TDL work for EPC contractors at fertilizer plants?
Yes. Four of the Phu My Fertilizer Plant projects were for the EPC contractor: the FAM conveyor and Libra packing system (2015), the fuel gas control system (2017), and the natural gas compressor and the tripper car (2022–2023).
Planning a compressor, conveyor or utility control upgrade at a fertilizer plant?
Speak directly with our engineers. Send your RFQ, scope of work or drawings: the engineers who program and commission the systems read them and reply, from the first review of the existing system to the proposed solution.
Email sales@tdl-ia.com.vn Request a site survey Hotline · Urgent breakdown support