Home › Services

Automation for Gas Processing Plants, Gas Stations and Terminals

Since 2014 TDL has worked on the control and safety systems of PetroVietnam Gas facilities: the Dinh Co Gas Processing Plant, the Phu My and Ba Ria gas distribution stations with the Long Hai and Phuoc Hoa block valve stations, and PV GAS Vung Tau Terminal (Thi Vai). The work covers compressor controls and vibration monitoring, a heater, shut-off valves and closing signals, shutdown systems and ICSS, station SCADA and the loading arm HMI. The projects below are grouped by equipment.

By equipment

Related services

Project references

Frequently Asked Questions

Which gas facilities has TDL worked on?

From 2014 to 2023: the Dinh Co Gas Processing Plant, Phu My Gas Distribution Station, Ba Ria Gas Distribution Station with the Long Hai and Phuoc Hoa block valve stations, and PV GAS Vung Tau Terminal (Thi Vai).

Can TDL build control panels for hazardous areas at a gas facility?

Yes. For the CC01 turbo expander at Dinh Co, Ex-p and Ex-e panels were certified for Zone 2 by a DNV (DNV GL) notified body. For heater E-401B at Phu My Gas Distribution Station, a flameproof and dust-protected local control panel was built for Zone 1/2 and Zone 21/22.

Can old PLC-5 controllers stay in service while the HMI is replaced?

At Thi Vai in 2023 the redundant PLC-5 controllers of the loading arm system were kept and connected to the new FactoryTalk View SE HMI through DH+ to EtherNet/IP converters, with 72-hour monitoring after cut-over.

Planning work on a gas compressor, heater, shutdown system or station SCADA?

Speak directly with our engineers. Send your RFQ, scope of work or drawings: the engineers who program and commission the systems read them and reply, from the first review of the existing system to the proposed solution.

Email sales@tdl-ia.com.vn Request a site survey Hotline · Urgent breakdown support