PVEP Thang Long – Dong Do Platform – ICSS Maintenance and Repair 2019
On PVEP's Thang Long – Dong Do platform, offshore Vietnam, TDL provided all equipment and automation software services for the maintenance and repair of the ICSS, through to commissioning and handover.
Key Facts
| End user | PVEP |
|---|---|
| Facility | Thang Long – Dong Do platform, offshore Vietnam |
| Industry | Oil & Gas – offshore production |
| Year | 2019 |
| System | ControlLogix · FactoryTalk |
| TDL role | Equipment and automation software services, installation, configuration, commissioning and handover |
Scope of Supply
- Software: Backed up the programs, programmed the logic and installed it on new workstations.
- Supply: All equipment for the maintenance scope.
- On-site services: Factory work, installation, configuration, commissioning and handover.

Related Oil & gasBreakdown support & resident engineersICSS & safety systemsPLC backup and version control
More Projects
- 2025–2026JVPC – RO Water Maker PLC Upgrade, Rang Dong Field
- 2025Golden Pass LNG (USA) Auxiliary Boiler Control System Commissioning
- 2024BSR Steam Turbine Generator Network & HMI Upgrade
- 2023–2024PVEP DMDP‑A Platform, Offshore Compressor Control Upgrades
- 2023PV GAS Vung Tau Terminal (Thi Vai) – Loading Arm System HMI Replacement
- 2023FSO Rang Dong MV17 – Hi-Foam Control System Functional Test
- 2022JVPC N1 Wellhead Platform – Process Control System Upgrade
- 2021Phu My Gas Distribution Station – Heater
E-401B Controller Upgrade