SEHC – FMCS and PMS Maintenance and Integration 2025 – ongoing
At Samsung's SEHC complex in Ho Chi Minh City, TDL maintains and upgrades the facility and power monitoring systems — 17 servers, 14 workstations and 37 PLCs — under a yearly maintenance contract with scheduled preventive maintenance and work orders.
Key Facts
| End user | Samsung Electronics HCMC CE Complex (SEHC) |
|---|---|
| Location | Ho Chi Minh City, Vietnam |
| Industry | Manufacturing – electronics |
| Year | 2025 – ongoing |
| System | Facility monitoring and control (FMCS) and power monitoring (PMS): 17 servers, 14 workstations, 37 PLCs |
| Platform | ControlLogix · AVEVA System Platform · Modbus TCP and EtherNet/IP |
| Contract | Yearly maintenance with scheduled preventive maintenance and work orders |
| TDL role | Preventive maintenance, troubleshooting, upgrade and integration, FAT and site commissioning |
Scope of Supply
- Preventive maintenance: PLC stations checked every six months and servers on a six- or twelve-month plan: backups with restore tests, firmware and redundancy checks, power supply, cabinet and wiring checks, with a report after each visit.
- Controllers: ControlLogix firmware migration and redundancy reconfiguration.
- PLC programs: Program modifications for HVAC and utility systems.
- HMI and SCADA: HMI migration and extension of the AVEVA System Platform SCADA.
- Communication: Modbus TCP to EtherNet/IP communication.
- Testing & commissioning: FAT and site commissioning.


Related Manufacturing & machine buildersBreakdown support & resident engineersSCADA & historianIndustrial networks & OT securityYearly maintenance contractsAVEVA (Wonderware)Facility and utility monitoring (FMCS)AVEVA InTouch (Wonderware) support and upgradesPLC backup and version control
More Projects
- 2026Crown Da Nang – Body Maker Control Upgrade to ControlLogix 5580
- 2026SEHC VD5 – AHU, OAC and Exhaust Fan Control Retrofit on CompactLogix
- 2025–2026SEHC – New Air Compressor Integrated into FMCS SCADA
- 2026Crown Dong Nai – Can Line 3 and Can Line 4 Front End Swap
- 2025Crown Da Nang – VFD Control Cabinet for Two Compressors
- 2025–2026SEHC Admin Building – AHU and OAC Monitoring System
- 2024Crown Dong Nai – New Strapper Machine Integration
- 2023Crown Dong Nai – Cupper Line 1
PLC-5 to ControlLogix Upgrade