Home › Service packages

Replace ordinary switches with managed Stratix and segment the control network with VLANs

Move the EtherNet/IP network onto managed industrial switches and separate the control zone from the office network, with diagrams and configurations kept on file.

Scope

  • Survey of the existing topology and devices
  • VLAN/segmentation and IP addressing design
  • Stratix configuration, replacement area by area within each area's shutdown window
  • PLC–HMI–drive communication test after replacement
  • Handover of network diagrams + configuration files

Not included

  • IT/OT firewall (quoted separately)
  • New cabling/panels outside the scope

What the plant prepares

  • Shutdown window for each area
DurationConfirmed after a survey — TDL states the scope and number of days before work starts
PriceQuoted per scope after the survey

Office switches used on a control network keep working — until broadcast, multicast or a single faulty port brings the whole line down. The Converged Plantwide Ethernet guidance (ENET-TD001E pp. 3-32–3-41, 3-63–3-74, 4-42–4-44) is the basis for the redesign: separating the control VLAN from the office network, fixing the IP addressing, configuring the Stratix switches (IGMP snooping, QoS for EtherNet/IP, port security). Plan the replacement area by area, each area in its own shutdown window. Handover includes network diagrams and configuration files so that IT and maintenance both hold a copy.

Related project: P&G Vietnam Dong An plant – network discovery and control system modernization, factory-wide network design with VLAN segmentation by production zone.

Related services:
Industrial networks & OT security

Related technical articles