Home › Technical articles

Đọc bằng tiếng Việt

IEC 62443 explained: zones, conduits, security levels and the Purdue model

TDL Industrial Automation · Last updated:

The IEC 62443 series has four groups of documents written for asset owners, integrators and product suppliers. This article explains the Purdue model and the IDMZ, zones and conduits, security levels SL 1–4, SL-T, SL-C and SL-A, the seven foundational requirements and how to use them on an upgrade project, with 4 figures.

What IEC 62443 is

IEC 62443 is a series of standards for the security of industrial automation and control systems (IACS): PLCs, DCS, SCADA, safety systems and the networks that connect them. It is written by the ISA99 committee as ISA-62443 and submitted to the IEC; the ISA and IEC editions of each document are identical and released as close together as possible. In 2021 the IEC recognised the series as a horizontal standard, meaning it applies across many industries rather than to one sector.

The series is not one document but a set, written for several parties at once. That is why a tender line such as "the control system shall comply with IEC 62443" means little until someone says which part, for which party and to which security level.

Four groups of documents, several parties

The parts are numbered in four groups (1-x to 4-x); the main ones are:

Group Main parts (titles paraphrased)
1-x General 1-1 Terminology, concepts and models
2-x Policies and procedures 2-1 Security program requirements for IACS asset owners; 2-3 Patch management (technical report); 2-4 Security program requirements for IACS service providers
3-x System 3-2 Security risk assessment for system design; 3-3 System security requirements and security levels
4-x Component 4-1 Secure product development lifecycle requirements; 4-2 Technical security requirements for IACS components

The series is written for several parties at once: Dragos names asset owners (the plant), system integrators and component suppliers among its stakeholders. Read by title, part 2-1 is written for the asset owner, part 2-4 for service providers, and parts 4-1 and 4-2 for the makers of products.

The IEC 62443 series: four document groups and their usersGeneral 1-x, policies and procedures 2-x, system 3-x and component 4-x, with the main parts and their users.The IEC 62443 series: four document groups and their usersGROUPMAIN PARTSUSED BY1-xGeneralConcepts, models,terminology1-1Terminology, concepts and modelsEveryone2-xPolicies &proceduresThe organisation'ssecurity program2-1Security program for asset owners2-4Requirements for service providersAsset owners ·service providers3-xSystemDesign andrequirements forthe whole system3-2Risk assessment, zones and conduits3-3System security requirements, SLsAsset owners ·integrators4-xComponentEach device andsoftware product4-1Secure productdevelopment lifecycle4-2Technical requirementsfor componentsProduct suppliersPart titles paraphrased from the ISA/IEC 62443 list on isa.org (read 1 Nov2026). “Used by” is TDL’s reading of each part’s title. Figure: drawn by TDL.
Figure 1: The IEC 62443 series: four document groups and their users. On a phone, swipe sideways to see the whole figure.

The Purdue model: where the levels come from

Most plant network drawings start from the Purdue model — the Purdue Enterprise Reference Architecture, developed in the 1990s by Theodore J. Williams and the Industry-Purdue University consortium. It describes levels 0 to 4: the process itself, the field devices that sense and act on it, the control systems (DCS, HMI, SCADA), manufacturing operations (MES, batch, historians) and business logistics (ERP). ISA-95 uses the same levels.

Rockwell's security design guidelines (SECURE-RM001J) build on these levels in the Converged Plantwide Ethernet (CPwE) architecture and apply ISA/IEC 62443 by grouping them into zones (chapter 3). The equipment named below is a typical example, not a list from the guide:

  • Cell/Area Zone, levels 0–2: the process (level 0), controllers (level 1) and area supervisory control such as HMIs (level 2);
  • Industrial Zone, level 3 (site operations): for example SCADA servers, historians, engineering stations;
  • IDMZ (Industrial Demilitarized Zone), a buffer between the Industrial and Enterprise Zones and the only path between them — often drawn as "level 3.5", although the guide itself does not number it;
  • Enterprise Zone, levels 4–5: for example ERP, email and the corporate network.

For the IDMZ, the same guide sets the rules: all traffic terminates in the IDMZ and none passes straight through, and EtherNet/IP control traffic stays within the Industrial Zone (chapter 3, "Industrial Demilitarized Zone").

Documents place equipment slightly differently: CPwE puts controllers at level 1 and HMIs at level 2, while the ISA-95 description in OPC Foundation's OPC 10030 places PLC and DCS at level 2. For security design, what matters is how assets are grouped into zones, not the exact level number.

The Purdue model and the zones of the CPwE architectureLevels 0 to 5, with the IDMZ buffer between the office and control networks.The Purdue model and the zones of the CPwE architectureLEVEL5Enterprise networkemail, internet, corporate systems4Site business planning & logisticsERP, office PCsIDMZIndustrial buffer zonehistorian replica, patch server, remote access gateway3Site operationsSCADA servers, historian, engineering stations, local AD/NTP2Area supervisory controlHMI, operator stations1ControllersPLCs, safety controllers0Processsensors, valves, drives, motorsEnterprise ZoneIDMZIndustrial ZoneCell/Area ZoneEtherNet/IP control traffic stays in the Industrial Zone and doesnot cross the IDMZ; no traffic passes straight through the IDMZ.Levels and zones from Rockwell SECURE-RM001J (CPwE), based on the Purdue model (PERA, 1990s).The IDMZ is often called “level 3.5”; the Rockwell guide does not number it. Figure: drawn by TDL.
Figure 2: The Purdue model and the zones of the CPwE architecture. On a phone, swipe sideways to see the whole figure.

Zones and conduits

The two ideas that change the network drawing most are the zone and the conduit:

  • A zone is a group of assets — physically or functionally related — that share the same security requirements. Every asset of the control system belongs to a zone.
  • A conduit is a grouping of the communication channels that connect two or more zones and share the same security requirements.

In practice a zone is drawn around equipment that should be protected to the same level: one production line, the SCADA servers, the safety system. A conduit is the controlled connection between zones — usually a firewall or a managed switch with access lists — together with the written list of flows allowed through it. Two zones with no conduit between them simply do not talk to each other.

An example of zones and conduits for one plantSix zones connected only through firewalled conduits; remote access and the office network go through the IDMZ.An example of zones and conduits for one plantOfficeERP, emailIDMZhistorian replica,remote access gatewayContractor/ vendorremote supportSite operationsSCADA, historian, engineeringLine 1PLC, HMI, drivesLine 2PLC, HMI, drivesSafety system (SIS)its own zoneC1C2C3C4C5C6C1Office ↔ IDMZ: replicated data only (HTTPS)C2Contractor ↔ IDMZ: approved, time-limited, logged sessionsC3IDMZ ↔ site operations: data replication, patches; nothing passes straight throughC4Site operations ↔ Line 1: listed SCADA ↔ PLC flows onlyC5Site operations ↔ Line 2: as C4, its own listC6Site operations ↔ SIS: read status only, no writesZone: assets sharing the same security requirementsConduit: a controlled channel between zonesIllustration only, not a design for a specific plant. Each zone and conduit needsits own SL-T from a risk assessment (62443-3-2). Figure: drawn by TDL.
Figure 3: An example of zones and conduits for one plant. On a phone, swipe sideways to see the whole figure.

The figure is an example, not a rule. What the standard asks for is the method: divide the system into zones and conduits, then give each one a target security level from a risk assessment.

Security levels: SL 1 to SL 4

IEC 62443-3-3 defines security levels in terms of the attacker each level should resist:

Level Protects against
SL 0 no specific requirement
SL 1 casual or accidental violation
SL 2 intentional violation using simple means, low resources, generic skills and low motivation
SL 3 intentional violation using sophisticated means, moderate resources, specific skills and moderate motivation
SL 4 intentional violation using sophisticated means, extensive resources, specific skills and high motivation

The same number is used in three ways:

  • SL-T (target): the level the asset owner wants for a zone or conduit, set by the risk assessment and written into the cybersecurity requirements specification.
  • SL-C (capability): what a system (part 3-3) or a component (part 4-2) can do natively, without added measures.
  • SL-A (achieved): the level actually reached by the installed system, normally assessed once it is in operation.

When the capability of the chosen system is below the target, the gap is closed with compensating countermeasures — added procedures or other technical means that meet the intent of the requirement.

The four security levels (SL) and the three kinds of SLSL1 to SL4 rise with the attacker's capability; SL-T is the target, SL-C the capability of a system or component, SL-A the level achieved in operation.The four security levels (SL) and the three kinds of SLPROTECTS AGAINSTSL 1casual or accidental violationSL 2intentional · simple means, low resources, generic skills, low motivationSL 3intentional · sophisticated means, moderateresources, specific skills, moderate motivationSL 4intentional · sophisticated means, extensiveresources, specific skills, high motivationSL-TTargetset by the asset ownerper zone/conduit afterthe risk assessment (3-2)SL-CCapabilitywhat the system (3-3)or component (4-2)provides nativelySL-AAchievedmeasured on the realsystem once in operationSL-C below SL-T ⇒ add compensating countermeasures(procedures, other devices), then check SL-A again.SL definitions paraphrased from Cisco’s ISA/IEC 62443-3-3 whitepaper (08/2024); SL-T/C/A after Dragos (2025). Figure: drawn by TDL.
Figure 4: The four security levels (SL) and the three kinds of SL. On a phone, swipe sideways to see the whole figure.

Seven foundational requirements

Part 3-3 groups its system requirements under seven foundational requirements (FR). The right-hand column is a plain-language reading, not the standard's wording:

FR Name In plain terms
FR 1 Identification, authentication and access control Who or what is connecting — users, devices, software
FR 2 Use control What each identity is allowed to do
FR 3 System integrity Software, configuration and data have not been altered
FR 4 Data confidentiality Only the right parties can read the data
FR 5 Restricted data flow Traffic only flows where the zones and conduits allow
FR 6 Timely response to events Events are logged, noticed and acted on
FR 7 Resource availability The control system keeps running under load or attack

Risk assessment before design (part 3-2)

Part 3-2 describes how the target levels are reached; the main steps are:

  1. Define the scope of the system under consideration and identify its critical assets.
  2. Carry out an initial assessment to prioritise, and partition the system into zones and conduits.
  3. Carry out a detailed assessment for each zone and conduit: choose how to treat each risk (avoid, transfer, accept or mitigate), set the SL-T and select the countermeasures.

The standard does not impose a particular risk method, so the assessment can follow the plant's existing risk process.

Using IEC 62443 on an upgrade project

  • Ask for the target levels. If a specification only says "comply with IEC 62443", raise a clarification: which zones, which SL-T for each zone and conduit, and which party performs the risk assessment.
  • List assets and data flows first. The list of flows that must cross between zones becomes the conduit rules on the firewalls; for Rockwell systems, see which ports FactoryTalk and Logix need through a firewall.
  • Check component capability. Compare the SL-C stated by each product supplier with the SL-T of the zone it sits in; record compensating measures where it falls short.
  • Route remote access through the IDMZ, with approved, time-limited and logged sessions rather than a permanent connection into the control network.
  • Plan patching and backups as part of operation, not as an afterthought; part 2-3 is the technical report on patch management.

For hardening the controllers themselves, see OT security for Rockwell PLCs.

Frequently asked questions

What is IEC 62443?

IEC 62443 is a series of standards for the security of industrial automation and control systems, written by the ISA99 committee as ISA-62443 and published in identical form by the IEC. It is organised in four groups: general, policies and procedures, system, and component.

What is the difference between a zone and a conduit in IEC 62443?

A zone is a group of assets that share the same security requirements, and every asset of the control system belongs to one. A conduit groups the communication channels that connect two or more zones and share the same security requirements; in practice it is the firewall or managed switch between zones together with the list of flows it allows.

What do SL 1 to SL 4 mean?

They describe the attacker a zone, conduit or product should resist: SL 1 casual or accidental violation, SL 2 intentional attack with simple means and low motivation, SL 3 sophisticated means with moderate resources, and SL 4 sophisticated means with extensive resources and high motivation.

What is the difference between SL-T, SL-C and SL-A?

SL-T is the target the asset owner sets for each zone and conduit after the risk assessment, SL-C is what a system or component can do natively, and SL-A is the level the installed system actually achieves. When SL-C is below SL-T, compensating countermeasures close the gap.

Which parts of IEC 62443 are written for the asset owner, service providers and product suppliers?

Read by title, part 2-1 is written for the asset owner, part 2-4 for service providers, and parts 4-1 and 4-2 for the makers of products. At system level, part 3-2 covers the risk assessment and the zones and conduits, and part 3-3 the system security requirements and security levels.

Sources

Read 1 November 2026. This article paraphrases the sources and does not quote them; read the original documents before designing or working on a system.

Related services: