Working for the EPC contractor, TDL migrated the GE Fanuc control system of a natural gas compressor at Phu My Fertilizer Plant to redundant ControlLogix 5580 with 1715 redundant I/O, keeping the machinery protection and anti-surge controllers integrated.
Key Facts
| End user | Phu My Fertilizer Plant (PVFCCo) |
|---|---|
| Contracted by | EPC contractor |
| Location | Phu My, Vietnam |
| Industry | Fertilizer & chemicals |
| Year | 2022–2023 |
| Equipment | Motor-driven natural gas compressor with lube oil, anti-surge and suction, discharge and vent valves |
| Original system | GE Fanuc PLC and GE SCADA |
| Upgraded to | Redundant ControlLogix 5580 (1756-L81E with 1756-RM2) · 1715 redundant I/O · EtherNet/IP |
| Integration | Bently Nevada 3500 machinery protection, anti-surge and performance controllers, Modbus links to the plant DCS |
| TDL role | Program and SCADA migration, internal test, FAT, installation and site commissioning |
Scope of Supply
- Controllers: Redundant ControlLogix 5580 controllers (1756-L81E) with 1756-RM2 redundancy modules and EtherNet/IP communication.
- I/O: 1715 redundant I/O with analog and digital modules for the compressor, lube oil and valve signals; intrinsically safe barriers for field devices.
- Integration: Bently Nevada 3500 rack, anti-surge and performance controllers, and Modbus links to the plant DCS.
- Software: Migration of the GE Fanuc program and the SCADA application to ControlLogix redundancy and a new operator HMI.
- Testing & commissioning: Internal testing, FAT, site installation and commissioning.


Related: PLC-5 & SLC 500 migration
More Projects
- 2025–2026 – JVPC – RO Water Maker PLC Upgrade, Rang Dong Field
- 2025 – Phu My Fertilizer Plant – 40-PK-5001 Ammonia Compressor Control Replacement
- 2025 – Golden Pass LNG (USA) Auxiliary Boiler Control System Commissioning
- 2025 – P&G Cabuyao (Philippines) 2-Lane Servo Capper Automation
- 2023 – Phu My Fertilizer Plant – Tripper Car Control System Upgrade
- 2021 – Phu My Fertilizer Plant – Demineralization System ControlLogix Relocation
- 2017 – Phu My Fertilizer Plant – Fuel Gas Control System Upgrade
- 2015 – Phu My Fertilizer Plant – FAM Conveyor and Libra Packing Control System Upgrade