Home › Projects

Phu My Fertilizer Plant – Fuel Gas Control System Upgrade 2017

Working for the EPC contractor, TDL upgraded the SLC 500 fuel gas control system at Phu My Fertilizer Plant to redundant ControlLogix with redundant I/O.

Key Facts

End userPhu My Fertilizer Plant (PVFCCo)
Contracted byEPC contractor
LocationPhu My, Vietnam
IndustryFertilizer & chemicals
Year2017
SystemFuel gas control system
Original systemAllen-Bradley SLC 500
Upgraded toRedundant ControlLogix with redundant I/O
TDL rolePanel fabrication and installation, PLC and HMI programming, network engineering, commissioning

Scope of Supply

Related: PLC-5 & SLC 500 migration · Rockwell Automation (Allen-Bradley)

More Projects

← Back to projects Request a quote