Phu My Fertilizer Plant – FAM Conveyor and Libra Packing Control System Upgrade 2015
Working for the EPC contractor, TDL upgraded the control system of the FAM conveyor and Libra packing system at Phu My Fertilizer Plant from ControlLogix L55 and RSView32 to ControlLogix L71 and FactoryTalk View.
Key Facts
| End user | Phu My Fertilizer Plant (PVFCCo) |
|---|---|
| Contracted by | EPC contractor |
| Location | Phu My, Vietnam |
| Industry | Fertilizer & chemicals |
| Year | 2015 |
| Systems | FAM conveyor and Libra packing system |
| Original system | ControlLogix L55 · RSView32 |
| Upgraded to | ControlLogix L71 · FactoryTalk View |
| TDL role | Control panel fabrication and installation, PLC and HMI programming, network engineering, third-party interfacing, commissioning |
Scope of Supply
- Procurement: Main hardware and automation software supplied by the EPC contractor.
- Hardware engineering: Control panel fabrication and installation at site.
- Software engineering: PLC and HMI programming, network engineering and third-party system interfacing.
- On-site services: Start-up, commissioning and hand-over at site.


Related: PLC-5 & SLC 500 migration
More Projects
- 2025 – Golden Pass LNG (USA) Auxiliary Boiler Control System Commissioning
- 2025 – P&G Cabuyao (Philippines) 2-Lane Servo Capper Automation
- 2024–2025 – P&G Vietnam Dong An – Packing Line Control System Modernization
- 2025 – Phu My Fertilizer Plant – 40-PK-5001 Ammonia Vapour Refrigerator Control Replacement
- 2025 – Crown Beverage Cans – VFD Control Cabinet for Two Compressors
- 2025 – SEHC Admin Building – AHU and OAC Monitoring System
- 2025 – SEHC – FMCS and PMS Preventive Maintenance and Integration
- 2024 – BSR Steam Turbine Generator Network & HMI Upgrade
- 2024 – Crown Dong Nai – New Strapper Machine Integration
- 2024 – Nestlé Tri An – Meurer Machine Migration and IS Area PLC Upgrade
- 2023–2024 – PVEP DMDP‑A Platform, Offshore Compressor Control Upgrades
- 2023 – Phu My Fertilizer Plant – Tripper Car Control System Upgrade
- 2023 – Phu My Fertilizer Plant – Natural Gas Compressor Control System Migration
- 2023 – Thi Vai Port Warehouse – Loading Arm System HMI Replacement
- 2023 – FSO Rang Dong MV17 – Hi-Foam Control System Functional Test
- 2023 – Crown Dong Nai – Cupper Line 1 PLC-5 to ControlLogix Upgrade
- 2022 – Vinh Hoan FeedOne Aquafeed Factory, Process Control & SCADA
- 2022 – JVPC N1 Wellhead Platform – Process Control System Upgrade
- 2022 – Thai Binh 2 Thermal Power Plant – ESD System Consultation (Trusted)
- 2022 – Nestlé Tri An – Biomass Processing Control System
- 2021 – Phu My Gas Distribution Station – Heater E-401B Controller Upgrade
- 2021 – CFT Copper – PLC-5 and DC Drives Upgrade for Mill, Furnace and AMPS
- 2014–2021 – P&G Vietnam Dong An – FactoryTalk Batch Process Control
- 2021 – Phu My Fertilizer Plant – Demineralization System ControlLogix Relocation
- 2021 – Thi Vai Port Warehouse – SC300E Shutdown System Firmware Upgrade
- 2021 – Phu My Gas Distribution Station – Inlet Shut-off Valve System
- 2020 – Pha Lai II Thermal Power Plant Subsidiary Systems
- 2020 – Vietsovpetro Central Compressor Platform – EDG and Switchgear Control System Upgrade
- 2020 – Kumho Tire Vietnam – Asset Management System for Production Lines
- 2019 – Dinh Co GPP CC01 Turbo Expander
- 2019 – Phu My Gas Distribution Station ICSS
- 2019 – Vietsovpetro BK-20 & BK-21 Wellhead Platforms – ICSS
- 2019 – PVEP Thang Long – Dong Do Platform – ICSS Maintenance and Repair
- 2019 – Intel Vietnam – SWTP Control System
- 2018 – Vietsovpetro LP Compressor – Siemens S5 and Bently Nevada 3300 Upgrade
- 2017 – Vietsovpetro Riserblock Platform – Sieger Fire & Gas System Upgrade
- 2017 – Crown Dong Nai – Body Maker PLC-5 to CompactLogix Upgrade
- 2017 – Phu My Fertilizer Plant – Fuel Gas Control System Upgrade
- 2017 – Dinh Co GPP – Governor Air/Fuel Control System Replacement for Gas Compressors
- 2016 – Vietsovpetro Central Compressor Platform – SIL 3 Fire & Gas System
- 2016 – Nestlé Dong Nai – Maggi Line and CIP Control System Upgrade
- 2016 – Dinh Co GPP – Gas Compressors K-01, K-02, K-03 Control System Replacement
- 2016 – Thanh Thanh Cong Tay Ninh Sugar Plant – Bently Nevada 3300 Vibration Monitoring Replacement
- 2015 – URC Vietnam – Coffee Extractor Production Line Control System
- 2015 – Dinh Co GPP – Vibration Monitoring for Gas Compressors K-1011A/B/C/D
- 2014 – Ba Ria Gas Distribution Station – Piping Monitoring Control System Upgrade
- 2013 – Vietsovpetro Central Compressor Platform – CO2 Control System Upgrade