Crown Da Nang – Body Maker Control Upgrade to ControlLogix 5580 2026
At Crown's Da Nang beverage can plant, TDL upgraded the control system of a body maker on can line 1 to ControlLogix 5580, moving the I/O and drives from DeviceNet to EtherNet/IP, with installation and start-up inside a line shutdown in 2026.
Key Facts
| End user | Crown Beverage Cans Da Nang |
|---|---|
| Location | Da Nang, Vietnam |
| Industry | Manufacturing – beverage cans |
| Year | 2026 |
| Machine | Body maker, can line 1 |
| Original system | DeviceNet I/O and drives · PanelView Plus HMI |
| Upgraded to | ControlLogix 5580 · EtherNet/IP · POINT I/O · PowerFlex 755 and PowerFlex 525 · PanelView Plus 7 · IO-Link |
| TDL role | Hardware supply, PLC and HMI migration, installation, start-up in the line shutdown, updated drawings and as-built hand-over |
Scope of Supply
- Controller: ControlLogix 5580 controller with 1756 digital I/O and an AMCI high-speed programmable limit switch module.
- Network: DeviceNet replaced with EtherNet/IP: POINT I/O adapters for the body maker and trimmer, Stratix switches and two IO-Link masters for the sensors.
- Drives: PowerFlex 755 and PowerFlex 525 drives connected over EtherNet/IP.
- HMI: PanelView Plus 7 fitted in the existing cut-out with an adapter kit; HMI application migrated, with a network status screen for the controller, drives and remote I/O.
- Software: PLC program migrated to Studio 5000 and tested before the shutdown.
- Site work: Installation and start-up during the line 1 shutdown, updated electrical drawings, as-built PLC and HMI programs handed over.





Related: Manufacturing & machine builders · Rockwell Automation (Allen-Bradley) · PanelView HMI migration · DeviceNet and ControlNet to EtherNet/IP
More Projects
- 2026 – SEHC VD5 – AHU, OAC and Exhaust Fan Control Retrofit on CompactLogix
- 2025–2026 – SEHC – New Air Compressor Integrated into FMCS SCADA
- 2025 – Crown Da Nang – VFD Control Cabinet for Two Compressors
- 2025–2026 – SEHC Admin Building – AHU and OAC Monitoring System
- 2025–ongoing – SEHC – FMCS and PMS Maintenance and Integration
- 2024 – Crown Dong Nai – New Strapper Machine Integration
- 2023 – Crown Dong Nai – Cupper Line 1 PLC-5 to ControlLogix Upgrade
- 2021 – CFT Copper – PLC-5 and DC Drives Upgrade for Mill, Furnace and AMPS