Home › Projects

Crown Da Nang – Body Maker Control Upgrade to ControlLogix 5580 2026

At Crown's Da Nang beverage can plant, TDL upgraded the control system of a body maker on can line 1 to ControlLogix 5580, moving the I/O and drives from DeviceNet to EtherNet/IP, with installation and start-up inside a line shutdown in 2026.

Key Facts

End userCrown Beverage Cans Da Nang
LocationDa Nang, Vietnam
IndustryManufacturing – beverage cans
Year2026
MachineBody maker, can line 1
Original systemDeviceNet I/O and drives · PanelView Plus HMI
Upgraded toControlLogix 5580 · EtherNet/IP · POINT I/O · PowerFlex 755 and PowerFlex 525 · PanelView Plus 7 · IO-Link
TDL roleHardware supply, PLC and HMI migration, installation, start-up in the line shutdown, updated drawings and as-built hand-over

Scope of Supply

Related: Manufacturing & machine builders · Rockwell Automation (Allen-Bradley) · PanelView HMI migration · DeviceNet and ControlNet to EtherNet/IP

More Projects

All project references (61) →

← Back to projects Request a quote