Thai Binh 2 Thermal Power Plant – ESD System Consultation (Trusted) 2022
TDL provided technical consultation for the emergency shutdown (ESD) system at Thai Binh 2 Thermal Power Plant: field operation and testing according to the SAT documents, Trusted hardware and logic consulting, and resolution of ESD problems and errors.
Key Facts
| End user | Thai Binh 2 Thermal Power Plant (PetroVietnam) |
|---|---|
| Location | Thai Binh, Vietnam |
| Industry | Energy & Power |
| Year | 2022 |
| System | Emergency shutdown (ESD) system on Trusted |
| TDL role | Technical consultation: field operation and testing per the SAT documents, Trusted hardware and logic consulting, troubleshooting |
Scope of Supply
- Field testing: Operation and testing in the field according to the system's SAT documents.
- Consulting: Trusted safety system hardware and logic consulting.
- Troubleshooting: Handling of problems and errors related to the ESD system.



More Projects
- 2024–2026P&G Vietnam Dong An – Packing Line Control System Modernization
- 2025–2026JVPC – RO Water Maker PLC Upgrade, Rang Dong Field
- 2026Crown Da Nang – Body Maker Control Upgrade to ControlLogix 5580
- 2026SEHC VD5 – AHU, OAC and Exhaust Fan Control Retrofit on CompactLogix
- 2025–2026SEHC – New Air Compressor Integrated into FMCS SCADA
- 2026VinWonders Nha Trang – Roller Coaster HMI Migration to PanelView Plus 7
- 2026VinWonders Grand Park – WindStarZ Ride HMI Replacement with PanelView Plus 7
- 2020Pha Lai II Thermal Power Plant Subsidiary Systems