Pha Lai II Thermal Power Plant – Subsidiary Systems Migration 2020
TDL migrated the
Key Facts
| Facility | Pha Lai II Thermal Power Plant (Pha Lai 2) – subsidiary systems |
|---|---|
| Location | Pha Lai, Vietnam |
| Industry | Energy & Power |
| Year | 2020 |
| Original system | Allen-Bradley |
| Upgraded to | ControlLogix / FactoryTalk View SE |
| Systems | Ash handling, FGD, ESP, soot blower, water treatment, wastewater treatment |
Scope of Supply
- Procurement: Main hardware and automation software supplied by the EPC contractor.
- Hardware engineering: Control panel fabrication and installation at site.
- Software engineering: PLC and HMI programming, network engineering, DCS and third-party system interfacing.
- On-site services: Start-up, commissioning and hand-over at site.






Related PLC-5 & SLC 500 migrationSCADA & historianRockwell Automation (Allen-Bradley)Rockwell Automation upgradesCoal-fired power plants
More Projects
- 2024–2026P&G Vietnam Dong An – Packing Line Control System Modernization
- 2025–2026JVPC Rang Dong Field – RO Water Maker PLC Upgrade, SLC 500 to CompactLogix 5380
- 2026Crown Da Nang – Body Maker Control Upgrade to ControlLogix 5580
- 2026SEHC VD5 – AHU, OAC and Exhaust Fan Control Retrofit on CompactLogix
- 2025–2026SEHC – New Air Compressor Integrated into FMCS SCADA
- 2026VinWonders Nha Trang – Roller Coaster HMI Migration to PanelView Plus 7
- 2026VinWonders Grand Park – WindStarZ Ride HMI Replacement with PanelView Plus 7
- 2022Thai Binh 2 Thermal Power Plant – ESD System Consultation (Trusted)