Crown Dong Nai – Can Line 3 and Can Line 4 Front End Swap 2026

In 2026 Crown's Dong Nai plant swapped the front ends of Can Line 3 and Can Line 4. TDL moved the motor power and sensor wiring between the two line control systems, extended the Can Line 4 panel, added drives and network links for the body makers, and changed and tested the PLC programs of both lines.

Key Facts

End userCrown Beverage Cans Dong Nai
LocationDong Nai, Vietnam
IndustryManufacturing – beverage cans
Year2026
LinesFront end of Can Line 3 and Can Line 4: body makers, cup conveyors, wet conveyors, oil mist
EquipmentPowerFlex 525 drives for the cup conveyors · Stratix 2000 switch · Ethernet links from six body makers · DH+ link between the two line systems · Rittal panel extension
TDL roleMethod statement, cable and sensor re-routing, panel extension, drives and network, PLC programming of both line systems, testing