Intel Vietnam – SWTP Control System 2019
Working for the EPC contractor, TDL delivered the SWTP control system at Intel Vietnam: Flex remote I/O and Rittal enclosures built to Intel's standards, PLC and HMI programming, and commissioning.
Key Facts
| End user | Intel Vietnam |
|---|---|
| Contracted by | EPC contractor |
| Location | Ho Chi Minh City, Vietnam |
| Industry | Manufacturing – semiconductors |
| Year | 2019 |
| System | SWTP control system: Flex I/O remote I/O and Cimplicity HMI |
| TDL role | Supply to Intel's standards, panel fabrication and installation, PLC and HMI programming, network engineering, commissioning |
Scope of Supply
- Procurement: Flex remote I/O PLC materials, Rittal enclosures and accessories to Intel's standards.
- Hardware engineering: Control panel fabrication and installation at site.
- Software engineering: PLC and HMI programming, network engineering and third-party system interfacing.
- On-site services: Start-up, commissioning and hand-over at site.

Related: Manufacturing & machine builders
More Projects
- 2025 – Golden Pass LNG (USA) Auxiliary Boiler Control System Commissioning
- 2025 – P&G Cabuyao (Philippines) 2-Lane Servo Capper Automation
- 2024 – BSR Steam Turbine Generator Network & HMI Upgrade
- 2023–2024 – PVEP DMDP‑A Platform, Offshore Compressor Control Upgrades
- 2022 – Vinh Hoan FeedOne Aquafeed Factory, Process Control & SCADA
- 2022 – JVPC N1 Wellhead Platform – Process Control System Upgrade
- 2022 – Thai Binh 2 Thermal Power Plant – ESD System Consultation (Trusted)
- 2021 – Phu My Gas Distribution Station – Heater E-401B Controller Upgrade
- 2021 – CFT Copper – PLC-5 and DC Drives Upgrade for Mill, Furnace and AMPS
- 2014–2021 – P&G Vietnam Dong An – FactoryTalk Batch Process Control
- 2020 – Pha Lai II Thermal Power Plant Subsidiary Systems
- 2019 – Dinh Co GPP CC01 Turbo Expander
- 2019 – Phu My Gas Distribution Station ICSS
- 2019 – Vietsovpetro BK-20 & BK-21 Wellhead Platforms – ICSS
- 2019 – PVEP Thang Long – Dong Do Platform – ICSS Maintenance and Repair
- 2018 – Vietsovpetro LP Compressor – Siemens S5 and Bently Nevada 3300 Upgrade
- 2017 – Vietsovpetro Riserblock Platform – Sieger Fire & Gas System Upgrade
- 2017 – Crown Dong Nai – Body Maker PLC-5 to CompactLogix Upgrade
- 2017 – Phu My Fertilizer Plant – Fuel Gas Control System Upgrade
- 2016 – Vietsovpetro Central Compressor Platform – SIL 3 Fire & Gas System
- 2016 – Nestlé Dong Nai – Maggi Line and CIP Control System Upgrade
- 2016 – Dinh Co GPP – Gas Compressors K-01, K-02, K-03 Control System Replacement
- 2015 – URC Vietnam – Coffee Extractor Production Line Control System
- 2013 – Vietsovpetro Central Compressor Platform – CO2 Control System Upgrade