Nestlé Tri An – Meurer Machine Migration and IS Area PLC Upgrade 2024
TDL carried out two control system upgrades at Nestlé's Tri An factory: the electrical and automation upgrade of the Meurer machine on the packaging line, and a PLC upgrade of the IS area with Wonderware SCADA reconfiguration.
Key Facts
| End user | Nestlé Tri An factory |
|---|---|
| Location | Dong Nai, Vietnam |
| Industry | Food & beverage |
| Year | 2024 |
| Systems | Meurer machine on the packaging line · IS area |
| TDL role | Electrical and automation upgrade, installation, line testing and three-shift monitoring; PLC upgrade and Wonderware SCADA reconfiguration |
Scope of Supply
- Meurer machine: Electrical and automation upgrade with installation and electrical arrangement; packaging line tested after the upgrade and monitored over three shifts with a report.
- IS area: PLC upgrade with installation, electrical arrangement and supply of cables and accessories.
- SCADA: Reconfiguration and modification of the Wonderware SCADA.
Related Manufacturing & machine buildersSCADA & historianAVEVA (Wonderware)AVEVA InTouch (Wonderware) support and upgrades
More Projects
- 2026Yakult Vietnam – Ice Bank Monitoring SCADA on FactoryTalk Optix
- 2024–2026P&G Vietnam Dong An – Packing Line Control System Modernization
- 2025–2026JVPC Rang Dong Field – RO Water Maker PLC Upgrade, SLC 500 to CompactLogix 5380
- 2022Nestlé Tri An – Biomass Processing Control System
- 2016Nestlé Dong Nai – Maggi Line and CIP Control System Upgrade
- 2016Thanh Thanh Cong Tay Ninh Sugar Plant – Bently Nevada 3300 Vibration Monitoring Replacement
- 2015URC Vietnam – Coffee Extractor Production Line Control System
- 2014–ongoingURC Vietnam – Yearly Maintenance of Drives and Control Systems