Yakult Vietnam – Ice Bank Monitoring SCADA on FactoryTalk Optix 2026
In 2026 TDL built a monitoring SCADA for the ice bank cooling system at Yakult Vietnam on FactoryTalk Optix. The existing Mitsubishi PLC stays in control; its data reaches the new SCADA through a Modbus RTU to Modbus TCP gateway, and the Optix runtime also serves the screens to web browsers on the plant network. The SCADA server is ready for expansion to other utility systems and for further functions.
Key Facts
| End user | Yakult Vietnam |
|---|---|
| Location | Vietnam |
| Industry | Food & beverage – probiotic drinks |
| Year | 2026 |
| System | Ice bank cooling system of the plant utilities |
| Existing control | Mitsubishi FX-series PLC, kept in service |
| New SCADA | FactoryTalk Optix runtime on a workstation · web access from browsers · Stratix switch · Modbus RTU to Modbus TCP gateway |
| Expansion | SCADA server ready for more utility systems and functions |
| TDL role | Survey, design, SCADA development, installation, operator training and hand-over |
Scope of Supply
- Survey and backup: Site survey of the existing ice bank control system and backup of the PLC program before any change.
- Communication: Serial port of the existing PLC connected through a Modbus RTU to Modbus TCP gateway and a Stratix switch to the SCADA workstation.
- SCADA: FactoryTalk Optix application with overview and equipment displays, alarms and log-in with the plant's user accounts.
- Web access: Optix runtime web server, so operators and engineers open the screens from a browser on the plant network.
- Ready for expansion: SCADA server and Optix project set up so that other plant utility systems and further functions can be added in later phases.
- Hand-over: Review with the plant team, operator training and hand-over of documents.
Related SCADA & historianRockwell Automation (Allen-Bradley)PLC backup and version controlConnecting existing equipment to SCADA
More Projects
- 2025–2026JVPC – RO Water Maker PLC Upgrade, Rang Dong Field
- 2026Crown Da Nang – Body Maker Control Upgrade to ControlLogix 5580
- 2024Nestlé Tri An – Meurer Machine Migration and IS Area PLC Upgrade
- 2022Nestlé Tri An – Biomass Processing Control System
- 2016Nestlé Dong Nai – Maggi Line and CIP Control System Upgrade
- 2016Thanh Thanh Cong Tay Ninh Sugar Plant – Bently Nevada 3300 Vibration Monitoring Replacement
- 2015URC Vietnam – Coffee Extractor Production Line Control System
- 2014–ongoingURC Vietnam – Yearly Maintenance of Drives and Control Systems