OEE shows how much of the planned time a line really makes good product at its ideal speed. The three factors, where planned time ends, a 480-minute shift worked through to 74.0 % with a cross-check, the six big losses, TEEP, common mistakes and collecting the data from the PLC.

OEE (overall equipment effectiveness) is the share of planned production time in which a machine or line makes good product at its ideal speed. It is calculated as availability × performance × quality, and the same number can be checked as good count × ideal cycle time ÷ planned production time. On the one-shift example worked through below, with 60 minutes of stops and 500 rejects, the line reaches 74.0 %.

What OEE measures

According to Wikipedia, the term first appeared in Seiichi Nakajima's 1982 book TPM Tenkai and became a central measure of total productive maintenance (TPM). OEE compares what a line produced with what it could have produced in the time it was planned to run. A score of 100 % would mean only good parts, made as fast as the process can run, with no stop time; Vorne calls that time fully productive time.

OEE is the product of three factors, each of which isolates one kind of loss:

Factor Calculation What reduces it
Availability run time ÷ planned production time every stop during planned time, planned or unplanned
Performance (ideal cycle time × total count) ÷ run time running slower than the ideal rate, including small stops
Quality good count ÷ total count rejects, and units that need rework

Run time is planned production time minus stop time. The ideal cycle time is the fastest cycle the process can achieve in optimal conditions, and the ideal rate is its inverse. Vorne describes quality as first pass yield: a unit that has to be reworked is not a good unit.

Multiplied together, the three factors reduce to one ratio: good count × ideal cycle time ÷ planned production time. Vorne presents this as the simple calculation. It gives the same OEE but cannot show which loss caused it, which makes it a good cross-check.

Definitions are not standardised across industries. Wikipedia notes that companies tailor them, and that ISO 22400-2:2014, the ISO standard on key performance indicators for manufacturing operations management, presents two OEE versions that appear inconsistent with each other.

The figure quoted most often as a target is 85 % (90 % availability, 95 % performance, 99 % quality). Vorne attributes it to Nakajima's 1984 book Introduction to TPM, where it was meant as a minimum for discrete manufacturing, and reports that most manufacturers score closer to 60 %. Wikipedia says that taking 85 % as a world-class target is in many cases wrong. Treat it as a rule of thumb and compare a line with its own history.

Planned production time: what is left out

The denominator decides the score, and sources draw it differently.

  • Vorne removes only the time when there is no intention to produce, typically breaks. Changeovers count as stop time, and its FAQ says preventive maintenance probably should too.
  • Sepasoft's OEE module calculates availability as run time ÷ (elapsed time − planned downtime), so planned downtime does not lower availability. Equipment modes such as maintenance, training or testing can each be included in OEE or not.
  • Time that is not scheduled at all sits outside both and is covered by TEEP, below.

OEE values calculated under different rules cannot be compared. Write down for each plant which events are outside planned production time, apply the same rules on every line and shift, and report any excluded time separately.

Worked example: one shift on one line

The example uses the default values of the OEE calculator on the TDL site. The 480 minutes are planned production time, so breaks are already removed.

Input Value
Planned production time 480 min
Stop time 60 min
Ideal rate 100 units/min (ideal cycle time 0.01 min = 0.6 s)
Total count 36,000 units
Rejects 500 units

Step 1, availability. Run time = 480 − 60 = 420 min. Availability = 420 ÷ 480 = 87.5 %.

Step 2, performance. At the ideal rate, 420 min of run time could have made 420 × 100 = 42,000 units. The line made 36,000. Performance = 36,000 ÷ 42,000 = 85.7 %. In time units: 36,000 × 0.01 min = 360 min of net run time, and 360 ÷ 420 gives the same 85.7 %.

Step 3, quality. Good count = 36,000 − 500 = 35,500. Quality = 35,500 ÷ 36,000 = 98.6 %.

Step 4, OEE. 0.8750 × 0.8571 × 0.9861 = 0.7396, so OEE = 74.0 %. Carry the factors with four decimals: multiplying the rounded percentages (87.5 × 85.7 × 98.6) gives 73.9 %.

Cross-check. Good count × ideal cycle time = 35,500 × 0.01 = 355 min of fully productive time, and 355 ÷ 480 = 74.0 %.

The same shift as lost minutes:

Loss Minutes How it is calculated
Stops 60 stop time
Slow running 60 run time − net run time = 420 − 360
Rejects 5 500 rejects × 0.01 min
Fully productive time 355 480 − 60 − 60 − 5
Where 480 planned minutes go: OEE step by stepFour bars drawn to scale: planned production time 480 min; minus 60 min of stops leaves 420 min run time (availability 87.5 %); minus 60 min of slow running leaves 360 min net run time (performance 85.7 %); minus 5 min of rejects leaves 355 min fully productive time (quality 98.6 %); OEE = 355 / 480 = 74.0 %.Where 480 planned minutes go: OEE step by stepPlanned production time: 480 min480 min = 100 %Run time: 480 − 60 = 420 minStops: 60 minAvailability A = 420 / 480 = 87.5 %Net run time: 36,000 units × 0.01 min = 360 minSlow running: 60 minPerformance P = 360 / 420 = 85.7 %Fully productive time: 35,500 units × 0.01 min = 355 minRejects: 5 minQuality Q = 355 / 360 = 98.6 %0120240360480 minOEE = A × P × Q = 355 / 480 = 74.0 %Time leftLoss at this stepLosses from the steps aboveTime split after Vorne (OEE.com, Calculating OEE). Numbers: the worked examplein this article, which uses the defaults of the OEE calculator on the TDL site; idealrate 100 units/min, i.e. 0.01 min per unit. Drawn to scale. Figure: drawn by TDL.
Figure 1: Where 480 planned minutes go: OEE step by step. On a phone, swipe sideways to see the whole figure.

The line lost as much time to slow running as to stops, and a downtime log alone would not show it. Expressed in minutes, the three losses can be compared directly.

The six big losses

Each factor is usually split into two losses. Vorne's names and examples:

Factor Loss Typical causes
Availability Equipment failure breakdowns, unplanned maintenance, no operator or material, starved or blocked
Availability Setup and adjustments changeovers, cleaning, warm-up, planned maintenance
Performance Idling and minor stops jams, misfeeds, blocked sensors, quick cleaning
Performance Reduced speed worn or dirty equipment, substandard material, inexperienced operators
Quality Process defects scrap and rework during steady-state production
Quality Reduced yield scrap and rework from start-up until production is stable, often after a changeover

Wikipedia uses different names for the same structure: waiting, breakdowns, minor stops, reduced speed, scrap and rework.

The six big losses sorted into the three OEE factorsAvailability holds equipment failure and setup and adjustments; performance holds idling and minor stops and reduced speed; quality holds process defects and reduced yield. The bottom row gives the lost minutes of the worked example.The six big losses sorted into the three OEE factorsAvailabilitystop time againstplanned timePerformancespeed while runningagainst the ideal rateQualitygood units againsttotal unitsEquipment failurebreakdowns, unplannedmaintenance, no operator ormaterial, starved or blockedIdling and minor stopsjams, misfeeds, blockedsensors, quick clean-upsProcess defectsrejects and reworkduring stable productionSetup and adjustmentschangeovers, cleaning,warm-up, planned maintenanceReduced speeddirty or worn equipment,poor material, runningbelow the ideal rateReduced yieldrejects and rework fromstart-up until production isstable, often after changeoversIn the example60 min of stopsIn the example60 min of slow runningIn the example5 min of rejectsLoss names and examples after Vorne (OEE.com, Six Big Losses); Wikipediauses other names: waiting, breakdowns, minor stops, reduced speed, scrap,rework. Minutes from the worked example in this article. Figure: drawn by TDL.
Figure 2: The six big losses sorted into the three OEE factors. On a phone, swipe sideways to see the whole figure.

Where a minor stop ends and a stop begins is a plant decision. Vorne ties it to the reason-tracking policy: if every stop longer than two minutes needs a reason, those stops count as equipment failure and shorter ones fall into performance. Its FAQ also warns against downtime thresholds so low that operators spend as much time collecting data as running the machine.

TEEP: adding the time that was never planned

TEEP (total effective equipment performance) multiplies OEE by utilization, which Vorne defines as planned production time ÷ all time; Wikipedia calls the same factor loading. If the example line runs one 480-minute shift per day, utilization is 480 ÷ 1,440 = 33.3 % and TEEP is 74.0 % × 33.3 %, which is 355 fully productive minutes ÷ 1,440 = 24.7 %. OEE shows how well the scheduled time is used; TEEP also shows how much capacity is left unscheduled.

Common mistakes

Choosing the ideal rate. Vorne accepts the builder's nameplate rate or a time study of the fastest speed the process can hold, does not lower it for machine age or material, and rejects the standard (budget) cycle time used for scheduling because it hides losses. PackML's design speed (MachDesignSpeed) is defined for the machine as installed, which is not the builder's maximum rating. Choose one basis, set it per product and write it down.

Performance above 100 %. Vorne's FAQ says that when an OEE figure exceeds 100 %, the cause is almost always performance, with an ideal cycle time set too long, that is an ideal rate set too low. Correct the rate instead of capping the result.

Moving changeovers into planned stops. Vorne includes changeover time in availability. Taking it out of planned production time raises OEE without changing the line, and the loss disappears from the report.

Averaging percentages. Line 1 runs 480 min at 74.0 % (355 fully productive minutes); line 2 runs a 120-min order at 40.0 % (48 minutes). The simple average is 57.0 %, but together they made 403 fully productive minutes in 600 planned minutes: 67.2 %. Vorne's FAQ makes the same point for several products on one machine: a simple average is insufficient, and run times, planned times and counts are summed before dividing. For a whole plant it gives an average of each asset's OEE weighted by planned production time or by value added; weighting by planned production time gives the same 67.2 % here. Wikipedia, on the other hand, says OEE should not be aggregated to department or plant level.

Counting rework as good. Vorne counts a unit that needs rework as a reject the first time it runs.

Collecting the data: by hand or from the PLC

Vorne recommends starting with manual OEE to learn the method, then moving to automatic collection for more accurate downtime, visibility of slow cycles and minor stops, and real-time figures. Sepasoft notes that downtime written on paper and typed in later is often inaccurate and out of date.

The TDL OEE page lists what is taken from the line PLCs: machine states (running, stopped, starved, blocked, fault), good and reject counts from fillers, vision systems, checkweighers and reject stations, and alarm words that give the cause of each stop. PackML, created by OMAC with ISA, defines tags (PackTags) that Wikipedia describes as designed to support OEE. In its OPC UA mapping (OPC 30050), the admin tags include ProdProcessedCount (good and defective units), ProdDefectiveCount, StopReason (the first event captured when the machine stops, for first-out reporting) and cumulative time in each state.

OEE data from the line PLC to the reportThe PLC provides machine state, total count, reject count and stop reason; the collection layer logs time-stamped events, takes the shift schedule and ideal rates, accepts operator-selected reasons and calculates A × P × Q; the results feed a live OEE display, shift reports, a list of top stop reasons and MES or ERP.OEE data from the line PLC to the reportLine PLCCollect and calculateUse of the resultsMachine staterunning, stopped,starved, blocked, faultEvent logeach state change andcount, with a timestampLive OEEby line, shift and productTotal countunits processed,good and defectiveSchedule and ratesshift, product, idealrate per productShift reportlost minutes per lossReject countfrom vision, checkweigher,reject stationsOperatorselects the reason whenthe PLC cannot tellTop stop reasonswhich to deal with firstStop reasonfirst-out alarmA × P × Qfrom summedtimes and countsMES / ERPcounts and stop data viadatabase or web serviceSignals after the TDL OEE page and OPC 30050 (PackML: processed count, defective count,stop reason); operator-selected reasons after Sepasoft's OEE documentation. Figure: drawn by TDL.
Figure 3: OEE data from the line PLC to the report. On a phone, swipe sideways to see the whole figure.

The PLC cannot always know why a machine stopped. Sepasoft's example is an operator pressing the stop button: the system records that, and the operator adds the real cause. Its OEE module also records mode, state, count, shift and standard-rate tags, and can count several machine states (its example: loading, heating, molding) as running. Vorne suggests measuring at the line's constraint, since its performance is the performance of the line.

On TDL's OEE and downtime monitoring page: states, counts and alarm words already in the PLC are read as they are; missing ones are added with small program changes tested on the line, usually starting with the bottleneck line or one with frequent changeovers. For older machines, see connecting existing equipment. The same page lists dashboards on Ignition, FactoryTalk View SE or AVEVA System Platform with a historian; the historian article explains that part.

OEE and MES

ISO 22400-2 covers key performance indicators for manufacturing operations management, and relates its equipment indicators to work units as specified in IEC 62264; Wikipedia's ISA-95 article lists the ISA-95 parts as modified versions of the IEC 62264 parts. Manufacturing operations management is level 3 in the ISA-95 model, the MES layer.

OEE can also be one module of an MES. Sepasoft's OEE Downtime module runs inside Ignition next to its Track & Trace, SPC and Settings & Changeover modules, with Business Connector for links to ERP. The TDL OEE page notes that counts and stop data can go to MES or ERP through database or web-service interfaces. For when a spreadsheet is enough and when a platform is worth it, see what MES is and three ways to get one and the MES on Ignition page.

Frequently asked questions

How is OEE calculated?

OEE is availability × performance × quality: run time over planned production time, ideal cycle time × total count over run time, and good count over total count. The product equals good count × ideal cycle time over planned production time, which is a useful cross-check.

What is a good OEE score?

The often quoted 85 % comes from Nakajima's work on TPM and was meant for discrete manufacturing. Vorne reports most manufacturers are closer to 60 %, so compare a line with its own history.

Should changeover time count against OEE?

Vorne includes it in availability. Sepasoft's OEE module can exclude planned downtime, so a plant has to set one rule, apply it everywhere and report the excluded time separately.

Why is my performance above 100 %?

Almost always because the ideal cycle time is set too long, for example a standard or budget rate instead of the fastest rate the process can hold. Correct the ideal rate for that product.

What is the difference between OEE and TEEP?

OEE is measured against planned production time. TEEP multiplies OEE by utilization, planned production time over all time, so it also counts time that was never scheduled.

Sources